Monday 21 October 2013

The start of the week has started with a number of jobs being done on the Princess 25 refit.

The week has started with a number of the smaller items on the refit list. Jobs such as painting and varnishing locker doors and lids. As well as making up new oak trims for main of the panels in the inside of the boat. Such as side lining panel joints and head lining panels as well as the edges and joints of the Formica areas of the boat. Areas such as the joints of the toilet bulkheads, and other such areas around the boat.

No comments:

Post a Comment