Tuesday, 22 October 2013

The jobs on the Princess 25 refit are coming along well.

Today it was the turn of making and machining the new oak trims to fit around the boat when the bulkheads and side and headlining are refitted to the inside of the boat.

Also the varnishing is coming along on the galley locker doors and the toilet locker door and along the gas locker lid. Also gluing the Formica to the bulkheads and tirming it up ready to fit the new oak tirms to them once they are in place on the boat.

Once all the trims are made up then comes the long drawn out job of varnishing them all with six coats of varnish.

No comments:

Post a Comment