Thursday 5 September 2013

The new build is getting underway and we will be exhibiting at the Essex Country Show on the 14th & 15th .

This photo shows the lower part of the keel being fixed to the building stocks before the upper keel or hog is fitted to it
 
This second photo shows the second half of the keel fitted and the mould stations fitted to the hog before the upper braces are fitted to the moul stations and the plank widths marked out on the moulds.
This photo shows the top cross braces in position and the braces ready to have the fore and aft braces fitted to hold the moulds in position while we fit the planking to the moulds as we build the new boat.
 
This new build will be on our stand at the Essex Country Show over the weekend of the 14th & 15th on Stand Demo 10, so pop along and take a look at the boat.
 
 

No comments:

Post a Comment