Now that the aft side as been started to be glassed in position on the aft side and that that side as cured off it is time to make a start on the forward side of the bulkhead
To help with glassing up the upper part of the bulkhead I have put in a small shelf to put the equipment and materials on while I glass up the upper part of the bulkhead and once this is done lower the shelf down the bulkhead to help do the rest of bulkhead glassing in
No comments:
Post a Comment