Starting to glass in the second bulkhead in the interior of the Morgan Giles 30. This bulkhead is going in where the old bulkhead came out from. However, the port bulkhead is going in a completely different position as the toilet compartment is going to be larger than before.
The new port bulkhead is going to be on the aft side of the mast post
The first layers of Fibreglass going on the aft side of the bulkhead before glassing up the forward side after the aft side as cured so that the bulkhead does not move while glassing up the forward side.
Because of the time of year having to keep the temperature higher enough to make the resin go off before the end of the working day.
No comments:
Post a Comment