The first part of the second portside main bulkhead is now almost dry fitted into its position and now needs a bit of final trimming to fit correctly. Once it is in the correct position the second part can be made and fitted and the whole of the bulkhead can be glassed into position.
The foredeck repair is well underway and now it is time to grind back the area of the foredeck around the repair to get the centre part up to the same height as the surrounding deck
The next two layers of CSM to get the height to the correct level to start filling and fairing the top surface ready to gel ocat the final surface to be the same level as the surrounding deck
No comments:
Post a Comment