Thursday 4 April 2019

Patterning up the cockpit carpet linings and getting the bilge pump pipe work sorted

Using the old carpets as patterns cutting the new linings a little over size 


Just laying the linings into position to check size and shape before gluing them in position 


Starting with the two carpet linings on either side where the helmsman and navigator seats will be fitted after the linings are glue in position


Refitting the centre bilge pump raiser pipe to the new diverter  which will in turn be fitted to the forward cockpit bulkhead.


No comments:

Post a Comment