Thursday, 6 January 2022

The aft seating area becoming along well

After fitting the two front panels it was time to put a coat of epoxy on the inside faces of the locker front , so that before they are fixed in place they will get a coat of grey bilge paint to finish off the inside of the lockers 



All the edges sealed with epoxy, then whem the backs are painted then they will be turned over and the fronts will get a thinned coat of varnish. 




The first of the lid panels fitted, then they will be cut into three separate lids as the owner as requested  




The port side getting patterned up ready to make the port side lids 




The starboard seat lid panel showing there is a good size area to sit on in comfort.



 

No comments:

Post a Comment