Tuesday, 4 January 2022

First day back in the New Year and the aft seating area front panels are being fitted

Cutting out the panels after the patterning up was done to ensure the front were made to fit, just a matter of transferring the marks off the pattern plywood to the marine plywood 


Cutting out the individual panels as they are slightly different  sizes as with boats the two sides are not always the same size and shape




Temporarily fitting the first of the panels just need to take some final measurements to make them fit.   



The aft edge angles taking a little while to fit correctly up to the aft locker bulkhead



Clamped into position ready to mark off the screw holes and them epoxy the back faces before fitting permanently. 




 

No comments:

Post a Comment