Having fitted the first 2 deck beams it was time to fit the last of the full length deck beams on the foredeck of the Cornish Crabber
This was done with the help of a very long spirit level
The second deck beam fitted into its socket which is moulded into the hull
A good tight fitted and only needs to be bedded down on sealant and a fixing put in it to fix it in position
Slowly fitting the last of the 3 deck beams in to its socket
All 3 deck beams fitted and now just need to remove them and put to one side and then get on with the chain locker bulkhead.
No comments:
Post a Comment