Having made up a length of dowel to press the moulding clay round the it was ready to gelcoat the moulding clay, so that I can start to lay up the missing CSM from the area.
Having made up the two side rails for the main hatch to slide on it was time to dry fix in position so that the rest of the main hatch sliding rails can be made up and the cross rail can be fitted
Thecross part as to be made up and fitted in the gap between the fore and aft rails
No comments:
Post a Comment