Monday 6 April 2020

forehatch and cockpit drains being fitted

The main fore hatch now fitted on its new teak plinth 


The forward end of the forward part of the forward deck head now getting filled up with hand rails and foredeck hatches 


The mainsheet track now finished apart from getting new end stops 


The lazarette locker just needs a vacuuming out and can be painted out with grey bilge paint 


dry fitting the cockpit drain lower section to make sure they line up in the correct position to be able to turned off when needed


The starboard lower section fitted and sealed with PTFE tape


The port side lower part of the cockpit drain taped up with PTFE tape before fitting the ball valve 


Both now fitted and now turning to fitting the upper section and then fitting the pipes to finish the job


No comments:

Post a Comment