Friday 3 April 2020

first of the foredeck hatches bolted and sealed down, then the next job the cockpit drains to be fitted

The fore deck is now starting to take shape with new handrails and now the first of the foredeck hatch being fitted on their new teak plinths 


A bit more addjusting needed on the larger of the forehatch plinths before it is fitted 


Now that I have all the pieces for the cockpit drains, it will be my next job in that end of the boat and so when the boat goes outside later on in the refit it will have a self draining cockpit, unlike it was when it first came to my yard the cockpit drains were blocked or seized closed 


After they are fitted it will be the turn of the fuel and water deck fillers to be fitted and sealed down and the tanks fitted in their new position and on their new plywood bases 