Monday 14 October 2019

Busy workshop with a couple of jobs underway side by side

The Mai-Star Class dinghy in the workshop for a few final touches, the main job is to fit the centreboard case and a set of floor boards and lower mast step, then get a overall cover made to keep the weather out of the boat over the winter  


The first of the new panels getting fitted to the bottom of speed boat 


Now that the new inside framework as been fitted it can be glassed to the original framework, then the new bottom panels can be glued in with epoxy and the a thin layer of matting can be glassed in to fix the first panel to the original bottom before gluing the outer layer to the new panel and the original bottom. 


No comments:

Post a Comment