Wednesday 6 March 2019

The toe rails now off the deck and are getting cleaned up and repaired in places before refitting therm later.

The hull to deck joint was in poor condition as in places it came apart when the toe rail bolts were released, although the two halves are bolted together with their own bolts as well as the bolts going through the toe rails.  


Before ant work can be done on the toe rail refitting the deck to hull joint will have to be re-fixed and sealed to ensure that area is sealed and the strength is re-instated.


The toe rails off the boat and are now being cleaned before they are repaired and put into storage before being refitted towards the end of the refit.