Making the new diesel heater box so that it looks more like the rest of the fitted lockers in the cockpit
The battery locker all finished off now ready to be varnished when the rest of the cockpit get re-varnished towards the end of its long refit
The old heater front which is being used as a pattern for the new panel.
The next major job in the cockpit refitting the head lining panels with new vinyl covering to match the side linings
Then it will be the turn of the carpet linings for the lower level coverings, which will be the colour of the later Hardy 25's which was dark blue and not the brown linings this boat was original covered in which the present owner wishes to be changed to the Blue that later Hardy 25's were covered in as standard.
No comments:
Post a Comment