Hardy 25 Lockers and lids coming together

The cockpit locker lids now fixed down and ready for the next stage in the reconstruction of the cockpit lids and lockers so that the cockpit can be lined with carpet.


Just got to get the same material as the rest of the cockpit floor surfaces 


The fuel tank front panel now getting fitted in place and then the top made to cover the fuel lines and filler pipe


The battery locker front now fixed and the top now needs making and fitted in place so that side of the cockpit can be rebuild.


The fuel tank panel is going to be fitted down securely so that the space heater can be refitted as it was before, however, this time fitted correctly.