Monday 18 March 2019

Jobs on the Hardy 25 and the Morgan Giles 30 fuel tank

The panelling from the Hardy 25 cockpit which make aft end lockers and cover up the steering ram and pipe work


The old locker fronts which are nor fitting well and which are not made out of Teak faced plywood which the owner wishes to have there when the cockpit is rebuild


The cabin diesel heater locker now going back together 


The fuel tank from the Morgan Giles which had old contaminated diesel and diesel bug, which is now getting a good clean out and de-greasing  of any foreign material 


The lid was cleaned at the same time  and will be getting a new rudder gasket before it is re-stalled in the yacht later on in the refit.


No comments:

Post a Comment