Friday, 29 April 2016

The battery box/storage locker is in position and the new fuel tank is getting ready to be boxed in and the first of the fresh water pipes are going in position

The new battery box/storage locker is finally on the boat and is getting fixed down into position so the engine wiring and the other electrics can start to be sorted out and fitted into the our positions 


The new fuel tank starting to get fitted into position and covered with plywood and made into a extra seating area once it is covered.


The first of the fresh water pipes clipped into position before the new galley area is made and fitted into position


No comments:

Post a Comment