The panels are now fitted in position and are ready to get screwed down after the inspection hatches are cut and made so that the tank fittings can be inspected from time to time.
Just got to fit the vents for the tanks and the anti smell filter.
Forward freshwater filler fitted, now ready tofit the rest of the pipe work to the tank
the pipework fitted and holes cut in the beams to keep it safe from damage
Now just got to fit the filler end of the pipe and vent to complete this first stage of the job and then get on with the pipes to the pump and on to the sinks,
No comments:
Post a Comment