Glassing in the aft side of the toilet bulkhead and cutting the holes for the toilet and sink discharge pipes so they can run from the toilet and sinks into the grey and black water tanks.
Continuing the glassing up to the top of the bulkhead, once this is done then fit the top to the compartment and glass this in as well.
Making a start on glassing the inside of the battery box/storage locker, just three sides and the bottom to do.
No comments:
Post a Comment