Monday 29 July 2013

The start of another busy week down at the yard

It the beginning of another busy week at the yard with a number of jobs on the go. This week will be spent doing lots of little jobs that need doing and take time to sort out. Like repairing the foredeck anchor locker lid that is in need of some serious repair work round the edges and the infill panel needs renewing and glassing back in place. Then we got to make a new set of rubbing stakes for the Dinghy "Jasmine" as the old ones were not very good and were made out of the wrong material for the job. Then there is a long list of work to do on Mai-Star II to get through, which as a number of small jobs on the list which can be do in the workshop.

Not to be forgotten there are a few engine repairs to do as well.

No comments:

Post a Comment