Starting the next stage of the Morgan Giles Refit

Now that the aft set of bulkheads are now glassed in with the correct number of layers of fibreglass the refit between the bulkheads can start with the making of the shower sump tray and the fitting of the floor bearers to support the new floor and the toilet.


The area between the bulkheads before the floor bearers are made and set out 




One of the original floor bearers which was able to be saved and will be refitted to set up the height of the floor.