Thursday 2 January 2020

Starting back with a lot of jobs to do on the Morgan Giles 30

Setting out the forecabin hatches so that it is known how much the deck as to be modified to fit the new hatches to the cabin roof  


The first modification is to cut away the upstand on the front of the main forehatch as it is in the way and does not allow the new hatch to go far enough forward to use the available space of the new hatch  



The new toilet compartment hatch is using the area that the original vent used and is just making the hole larger to let more air flow into the toilet compartment 


The new toilet compartment ready for the construction of the new toilet and shower and airing space to be fitted 


The only job to do first is to glass up the old window space as this is no longer needed 


The same job to be done on the starboard side which is going to be tool and spares locker and work bench 


The forecabin now ready to have the rest of the work done to it, glassing in the crash bulkhead and chain locker


The main cabin portside to have a water tank made to fit the space which will then have a bunk front and top to cover it 


The starboard side to have the galley area 


Under the cockpit sole there is going to be one of the two water tank fitted on a new shelf the other water tank to be fitted in the aft locker


The opening for the new small toilet compartment hatch 


The hatch is in need of a small plinth as to deck as more than a little curve to aloud  for it to fit on the deck 




No comments:

Post a Comment