Thursday, 23 May 2019

The fiddle rails in position and so the engine control is now fixed back in position and the last of fixture fitted to the wheelhouse roof

Now that the teak fiddle rails are fixed back on the shelves the engine control can be fixed back into position 


Now that the deck glands have arrived the wind speed and direction head unit can be wired up and the cable can be run from the roof to the steering consul


The neat deck gland finishes the job off well  


Now that the aft navigation base as been modified it just needs to be wired up and the navigation light fitted. 


No comments:

Post a Comment