Now that the teak fiddle rails are fixed back on the shelves the engine control can be fixed back into position
Now that the deck glands have arrived the wind speed and direction head unit can be wired up and the cable can be run from the roof to the steering consul
The neat deck gland finishes the job off well
Now that the aft navigation base as been modified it just needs to be wired up and the navigation light fitted.
No comments:
Post a Comment