Monday 16 November 2020

The speed boat as changed colour to its final colour apartfrom the red chine line and the repaired trailer

Over the weekend the hull topsides were sprayed their final colour apart from the red chine line which will be painted in as one of the last jobs to do on the hull.


The final coat will be put on once the hulll is back on the trailer and the other work is done of the top of the boat.Sorting out the deck the edging of the deck to hull joint and refitting the engine and the outdrive leg.





The traileris now repaired with new steel members in the trailer and now fitting the wooden rails for the hull to be supported on when being launched and recovered after doing its sea trials 





 