Friday, 14 February 2020

The lazarette locker bulkhead and the last piece of the main bulkhead being glassed into position

The lazarette locker port side bulkhead now glassed into position on its aft side face 




The fibreglass being done on the last piece of the port side bulkhead and once this is done the work can start on the interior 




No comments:

Post a Comment