Wednesday 12 February 2020

Shower tray sump plug making underway

Having made the general shape and size it is now time to fair the surfaces and the edges so that a moulding can betaken off the plug


The first job is to fill the surface where necessary to then fair up the surface so a moulding can be made


The last two floor bearers getting a final coat of epoxy before getting fitted into the area between the fore cabin and the main cabin 


No comments:

Post a Comment