Wednesday, 10 July 2019

Work coming along on the Hardy 25 down in Bristol

The TV is now installed so that owners children  can watch the TV or watch videos as it is a multi player TV


The toilet / shower compartment coming along with just the needs splash panels for the bulkheads and a shower curtain and the discharge pump for the shower tray.


The cabin lights now all going back up and testing the system to ensure they are all working



Now that the lights are back up the curtain rails are going up 


One of the last jobs on the boat is to plumb up the hot water tank to the rest of the water system so when the engine is running there will be plenty of hot water for a shower.


No comments:

Post a Comment