Friday 22 February 2019

Work on the Hardy 25 progressing with the new locker tops being put in and getting fixed in position and the old panelling being replaced to with panels

The first of the cockpit locker tops placed in position and getting ready to be fixed in permanently and hinged to make them be able to be used for storage   


The old panels now removed and being dismantled ready to be used as patterns for the new teak faced panels to be made and fixed in position and then the helmsman seats can be made and fitted 


Over the fuel tank the diesel heater will be moved to a safer position.


No comments:

Post a Comment