Thursday, 6 September 2018

So the upper re-decking starts

The first fore cabin panel is glued and screwed down and an off cut from the lower deck is the correct size to make the front fore cabin panel.


The main cabin roof forward area is the size of one sheet of plywood so this is a good thing as the only cutting is the length and not the width


The first panel glued and screwed down and now is ready for trimming 


Wednesday, 5 September 2018

Getting the fore cabin roof/ deck cut and fitted to the deck beams

Setting out the plywood to get the new deck measured up 


Making sure the deck beams are clean of any old bits of deck plywood and ready to fit the new plywood to the deck beams



The first piece marked out on the outside edges and ready to cut down to size


The first piece dry clamped to the deck beams ready to mark out the deck beams to will know where to drill the fixing holes for the screws to fix it down when it is glued in place.


hull in the cockpit now ready to paint so the reconstruction of the cockpit can get underway

The owner has done a very good job of cleaning out the cockpit hull and as removed all the loose paint and the dirt and grease from the hull, so it is now ready to paint out and once this is done the cockpit framework can go back in and the cockpit will then be better than before, 


As normal the worse of the loose paint was in the under water sections of the hull and where the engine was seating and where it was not normally possible to paint on a yearly basis 


Because the bilge stringer is not in place it will be possible to paint under this area easily and make sure the area in painted



The first coat of thinned down primer to penetrate the bare wood




Tuesday, 4 September 2018

Putting the company signage over the workshop door, people will now now know the work we do and will be able to find us.

At long last got round to putting the company signage over the workshop door,  people will now now know the work we do and will be able to find us. 


The van has been done as well so people will be able to stop when we are out and about on the local and nationwide roads 



Monday, 3 September 2018

The aft cockpit bulkhead has now been removed ready to fit the new bulkhead and rebuild the cockpit

The aft bulkhead in place before removing it to install a new marine plywood bulkhead in its place  


The bottom rail which was the back support for the cockpit floor which be beefed up to make it stronger to support the area of the cockpit floor 


The bottom rail removed after it was find to not be held there by much at all


The top edge is cut away so that the new bulkhead can be fitted to the under side of the cockpit coaming



The top edge now removed so to be able to fit the new bulkhead to the deck beam



The bulkhead now all removed and the reconstruction can begin