Saturday, 17 August 2024

The Morgan Giles 30 at the next boatyard to get engine installed and the mast erected and rigged .

The Morgan Giles 30 at another boatyard near to my yard which has the equipment to install the engine and erect the mast and get it rigged  and have the Pilpit and Pushpit and stanchions refitted.

Also the patches on the bottom that were not able to be  Gelshielded  before can now be done before the bottom is antifouled.. 


Plenty of extra props under the boat to make it safe to work on deck, especially the foredeck which with its long overhang from the front of the keel. 


 

Wednesday, 14 August 2024

The Morgan Giles 30 as left the boatyard to have the engine installed and the boat rigged.

Cleared the yard so that the transport could pick her up and load on their flat bed trailer


The transport arrived on time and were soon ready to load her.


Getting the legs out on the truck ready for the big lift.


Up and over the yard fence and on to the  cradle.


Loaded on the truck and just got to release the slings and strap her down to get ready to transport to her new home to get the engine installed and the yacht rigged.


Now got an empty yard, however, not for long as other work is waiting to come in and get work done.


 

Thursday, 8 August 2024

Finishing touches being done to the 8ft dinghy before off for delivery to its owner.

The gunwales getting varnished and the inside being grey flowcoated.


The centre thwart being given its coats of varnish to protect for the first year.


The centre thwart fitted and the bow ring fitted to the oak breasthook and the quarter knees are fitted just got to fix the rowlock blocks.


Just got to finish off the varnishing and seal the top edge of the hull with sealant.