Tuesday 8 February 2022

Making the front panel and locker lid for the forward seating area and skimming the water tank plug with low density epoxy filler


Making the first of the two lids for the front lockers/ seats 



Using the patterns that made the starboard panels 




The starboard lid in one piece before it is cut in two to access different parts of the locker




The front panel cut in two so that the front part can be removed to gain access to the fuel tank stopcock 




This phot shows the area in the bow filling up with the new seats and lockers




The water tank plug for the Morgan Giles 30 getting a coat of low density epoxy filler so that this can be sanded back to give the surface a smooth finish to make the water tank from once it is polished and waxed.



 

No comments:

Post a Comment