The foredeck area is now taking shape and the bulkhead has its first coat of thinned varnish to protect from getting dirty
The inspection hatch is also fitted so that the fuel tank pipework can be done with the fuel tank in position
The engine is finally bolted down and the work around the engine can be started
The aft bulkhead s now ready to be made and then the aft deck can be fixed down in position
No comments:
Post a Comment