Wednesday 3 November 2021

Engine finally in and bolted down and the locker at each are taking shape

The foredeck area is now taking shape and the bulkhead has its first coat of thinned varnish to protect from getting dirty 


The inspection hatch is also fitted so that the fuel tank pipework can be done with the fuel tank in position 



The engine is finally bolted down and the work around the engine can be started



The aft bulkhead s now ready to be made and then the aft deck can be fixed down in position



 

No comments:

Post a Comment