Thursday, 26 May 2016

A few of the smaller jobs ticked off, so some of the bigger jobs can get finished off.

The deck block and wood burning stove deck flange fitted and ready to have the pipe work fitted


An inside view of the deck fitting just got to cut back the excess bolt and paint over the bolts


Last of the side panels back in place .


Fibreglass tape the corners of the bulkhead ready to cover the rest in glass cloth and seal the plywood and make this whole area into a shower/ toilet and wet room


Fibreglass tape the bulkhead to the deck head 


Covering batten over the bulkhead joint where the two halves had to be fitted separately to fit them into position. 


No comments:

Post a Comment