The deck block and wood burning stove deck flange fitted and ready to have the pipe work fitted
An inside view of the deck fitting just got to cut back the excess bolt and paint over the bolts
Last of the side panels back in place .
Fibreglass tape the corners of the bulkhead ready to cover the rest in glass cloth and seal the plywood and make this whole area into a shower/ toilet and wet room
Fibreglass tape the bulkhead to the deck head
Covering batten over the bulkhead joint where the two halves had to be fitted separately to fit them into position.
No comments:
Post a Comment