Monday, 18 January 2016

Mai-Star II's Refit coming along well with the new cockpit seats getting fitted into position.

The first of the cockpit seats to go back in position and it is making the cockpit look very small now.


The port side is getting the manual bilge pump pipe run sorted before the seat can go into position.


The port side seat now in position, now that is done the bilge pump run can be clipped back and tried up and sorted.


Finally the cockpit seats in position, now got to get the Samson Posts fitted through the seats and fixed to the Cockpit coamings. 




No comments:

Post a Comment