Saturday, 12 November 2011

Repairs to Thames river skiffs

Te hull of the Skiff rub down ready for revarnishing
 after the repairs were done




Same job of the foot board
Aft floorboards refitted after replacing broken ribs in back of boat

Outside of Revarnished with six coats of varnish

New oak Rowlocks


Repairs to end of Keel and Two new planks fitted
Another photo of the 2 new planks
The inside of the skiff given the same threatment as the outside six coats of varnish
At the same time I was restoring a Fox & Son Motor launch