Friday 22 January 2021

First part of the new inner keel and the forward floor bearers getting rerady to be glassed into position

The forward part of the inner keel dry fitted and ready to be bedded down on a bed of thickened epoxy and then glassed into position



Now that the inner keel is dry fitted to the bottom of the hull, so it is ready to get bedded down on thickened epoxy  and the glassed over and then the floor bearers will be glassed into position to strengthen before the next stage is started. The engine beds to be made and fitted.




 

No comments:

Post a Comment