Tuesday 5 January 2021

Boat Movement morning down at the boat yard and change about in the workshop


The picnic boat is now in the workshop so that it can start to dry out before it is lifted off its trailer so that the work can get underway on its refit 


Bit of a tight squeeze down the side of the boat until work gets underway on the car  


Car restorations undertaken as well in these difficult times


The dinghy mould as had to go outside for a while the picnic boat gets its refit. 


The speed boat that has been in the workshop for while a long time is now outside while the picnic boat is refitted and then that will be brought back in the workshop, however that will be done when the boat is turned over and sitting on its keel again. 



 


No comments:

Post a Comment