Monday 22 April 2024

The new galley is moving forward with the water system fitted and now the gas system to get sorted out.

The new mixer tap fitted and the hot and cold water pipes connected up to the water pipes. Now got to get the water pump fitted and wired up so that we can run the system.


The water system coming together and the floor as to be fitted in the locker to cover the pipes and have some where to put the pans and stores when the owner goes cruising.


The sink waste pipe to fit  after the floor and shelf go in the galley area, the the new lids to go over the sink and hob can be fitted. 


 

Saturday 20 April 2024

Busy, Busy week on the Hardy 25 refit.

The headlinings are now back up in the cabin apart from the toilet compartment which needs lining out on the steering bulkhead.


The divider bulkhead between the fore part of the cabin and the main part so that the cushions will stay in their correct position and give a back rest to the person in the fore part of the cabin.  


Looks a lot better than seeing bare fibreglass in the roof space of the cabin.



Also the rope fender is back on the boat and looking like a true Hardy again.


The calorifer is now installed and plumped up to the engine and the water system. Just got to fit the water pump and then fill the water tank up and test the system. 


Sorting out the birnest that was the wiring into some origiansed order once more and with all the old no longer used wiring that the boat had added over the years.