The new mixer tap fitted and the hot and cold water pipes connected up to the water pipes. Now got to get the water pump fitted and wired up so that we can run the system.
The water system coming together and the floor as to be fitted in the locker to cover the pipes and have some where to put the pans and stores when the owner goes cruising.
The sink waste pipe to fit after the floor and shelf go in the galley area, the the new lids to go over the sink and hob can be fitted.
No comments:
Post a Comment