Thursday 30 November 2023

The start of Stage two, getting the hull linings glued on to the hull and finishing off the cabin side linings.

The cabin side linings all now glued up under the side decks and the tops of the hull linings glued to make the linings complete from deckhead to the bottom edge of the side of the hull.


The hardest part was getting the linings to glue up under the side decks and to get the top edges of the hull linings to meet in a neat line.


The hull now completed and the bunk fronts to do next after running the water pipe from the water pump in the port bow locker and round to the galley area and under the shower tray to the hot water tank under the cockpit floor.

The pile of carpets are getting smaller, although it does not look like at the moment.


 

No comments:

Post a Comment