Thursday, 2 November 2023

Hardy 25 refit, some of the smaller items getting done around the poor weather outside

While we can not work outside on the boat, it gives us time to get on with some of the smaller jobs in the refit, such as repairing the shower tray by fitting in the large hole in the shower tray that is not needed any longer as there is not a sea toilet fitted any longer to the boat. 


Another job that as been done over the space of a few days is the re-varnishing of many of the trims from the main cabin and the cockpit which are getting lots of coats of varnish before being re-fixed in position when the bulkheads and other parts go back into the cabin. 

The cockpit step boards getting their coats of white marine gloss before getting the centre sections painted with non slip paint and then re-fitted in the cockpit.

The pile of bulkheads all ready to be fitted back into the cabin after the hull and side linings are re-glued and the new windows and rubbers fitted and the windows have been sealed.  


 

No comments:

Post a Comment