Tuesday, 7 November 2023

A day spend sorting out parts of the Hardy 25, so we can make headway on getting the cabin sides relined and the carpets lings back in place.

One of the jobs that has been needed to be sorted was the wiring behind the steering consul, now the wiring that was not longer needed has been removed the area in a lot clearer and we can now start to make inroads into sorting out what is needed to be there and what is surplus to the boats needs from now on.


The vast space of the inside of a Hardy 25 with all the inside furniture removed and the linings as well, just got to remove the old foam backing off the hull and cabin sides and then will be able to start putting linings back in place and then the bulkheads.


Some of the old wiring that is not needed any longer and can be recycled 


The cockpit linings now getting removed and soon be time to reline the area again with its new lnings 



Now for the bing clean up and bag up the rubbish to be removed from the boat.


 

No comments:

Post a Comment