The inside is starting to look more a like the way it was when it was originally build.
The doors are now going back on and the new galley worktop is now refitted
The bottom door trim is now back in place, as is the cabin step which is now back in position and just needs the two small side sections and the hinges fitted to the lid.
The galley is now ready to have the oven and hob fitted as well as the new deep sink as well.
Before the sink and hob can go in the electric power for the oven as to be conneto the oven as does the gas pipes and fitting to run both the hob and oven. Also the water pipes have to be finished off and plumped up as when the top is fixed down there will be no easy way to sort any of the pipe work or plumping.
Just got to get a pair of hinges to make the locker/step useable as a storage area.
No comments:
Post a Comment