Tuesday 19 June 2018

work progressing on the Hardy 25's shower tray moulding and the Finesse centreboard bolt removal

The Hardy 25's shower tray plug mould is now constructed and now it is being filled and faired so that it can be coated with epoxy to seal the surface and then the black gelcoat can be applied to finish the plug surface before the plug is used to make the custom shower tray for this Hardy 25.


A lot of filling and fairing to be done until the surface is good enough to make it into a plug to take a moulding off




A long job for the owner to remove the seized bolt out of the iron stub keel a lot of patience as this is not an easy job at the best of times.  