Sunday 10 June 2018

An empty workshop space, however not for long and a small grp repair to do.

A clean and tidy space in the workshop getting ready for the next boat to come in to have its decks replace and a few other smaller jobs to do while it is in the workshop


A old grp dinghy that got a hole in the bottom while being recovered after a days sailing


The position of the repair is a bilge keel which is a difficult repair to do as it will mean making a small mould of the area before rebuilding the area after the old damage grp is removed


The small hole , but with all repairs it looks easy, however the inside is inside a bouyancy tank which is going to opened up to get to the inside of the tank to get to the inside part of the repair. 


No comments:

Post a Comment