engine serviced and heat exchanger replaced and now ready to put back in its yacht.
The yacht it is going back into and the recommissioning the yacht and the engine over the next few days.
All change in the workshop with the Shetland Black Hawk outside ready to commission the engine and connect up the steering.
The clinker workboat is not repairable so it is being stripped down for spare and then will be disposed of
A fishing dory in for some large bit of TLC and a good clean down and a glassfibre repair to the hull.
No comments:
Post a Comment