Monday 9 April 2018

Tackling the fuel tank and heater and getting the front ready to replace the chain locker bulkhead.

The locker front removed to expose the fuel tank and the diesel heater above it in a very poorly made locker


This locker is going to be redesigned so that it is safer than it is at the moment


Looking into where in the cockpit it can be sited so it is out of the weather. 

The chain locker before it was removed 


The chain locker bulkhead removed, now ready to grind back the old fibreglass matting ready to glass in the new bulkhead



Removed the side lining carpets to keep the dust out of the material. 



The old bulkhead out of the boat in the workshop ready to make a new bulkhead out of the old bulkhead used as a pattern.




No comments:

Post a Comment