Friday, 6 January 2017

Deck repairs to 1960's wooden ketch

Cutting the rotten gunwales and a small repair to forward deck beam.


Fitting the sub deck 


Fitting the gunwale grading pieces 


Gluing and screwing in sub deck 


Refitting the stemhead fitting after fitting a spacer panel to the back of the stem


Foredeck area epoxied and matted over to make it watertight


Fitting a grading to the hood end 


Fitting grading piece to edge of deck 


Fitting the inter panel to protect the area of the toe rail under the fair leads 


The job on the foredeck completed 


A lot of work still ahead as there are a number of jobs still to do 



No comments:

Post a Comment